Case Study

Riviera Tower — ICT Project Management

Project governance for the ICT workstream, ensuring structured planning, stakeholder alignment, and controlled execution across the ICT delivery lifecycle.

Office: Chrysanthou Mylona 12, Limassol, Cyprus

Riviera Tower, Ellinikon Athens — exterior view
Riviera Tower — project visual

Executive Summary

Riviera Tower is a landmark residential skyscraper in Ellinikon, Athens. The building consists of 50 floors and includes 176 luxury apartments along with multiple common areas. In an environment like this, ICT infrastructure must be delivered with precision and operate reliably from day one.

CITROBC’s role focused on project governance for the ICT workstream: defining scope boundaries, coordinating stakeholders, tracking progress against milestones, managing risks and changes, and supporting readiness for acceptance and handover.

Riviera Tower — Building Features

Building Features

  • Landmark residential skyscraper in Ellinikon, Athens
  • 50 floors
  • 176 luxury apartments plus multiple common areas
  • Apartments served by an independent FTTH (Fiber To The Home) network
  • Future-proof connectivity foundation supporting high-speed services and flexibility for residents

Wireless & Security Solutions

The ICT scope required careful orchestration within a broader construction program, with multiple teams, technical disciplines, and dependencies that needed to remain aligned throughout the delivery lifecycle.

  • Stakeholder and vendor alignment across parallel workstreams
  • Milestone-driven delivery and dependency management
  • Readiness for testing, acceptance, and handover
  • High-performance wireless connectivity to support scalability and operational continuity
Wireless and Security Solutions

Scope of Work

Objectives (ICT Scope)

  • Apply a structured Project Management approach for the ICT workstream
  • Maintain alignment between stakeholders, vendors, and on-site teams involved in ICT delivery
  • Ensure predictable execution through planning, milestones, and dependency management
  • Support readiness for testing, acceptance, and handover of ICT deliverables

CITROBC Role — Project Management Scope (ICT Workstream)

As the Project Management partner for the ICT scope, CITROBC provided a centralized coordination layer. Responsibilities included:

  • Scope coordination & prioritization (ICT): Clarifying ICT deliverables, sequencing, and acceptance expectations.
  • Planning, milestones & dependencies: Maintaining an execution roadmap for ICT activities and managing dependencies with other workstreams.
  • Stakeholder & vendor coordination: Aligning communication, decisions, and action follow-up across involved parties.
  • Progress tracking & reporting: Monitoring status, surfacing blockers early, and keeping delivery predictable.
  • Risk, issue & change management: Documenting risks/issues, supporting resolution paths, and coordinating change alignment.
  • Handover readiness support: Coordinating documentation readiness and acceptance alignment for ICT deliverables.
  • End-to-end design & engineering consultancy (internal network infrastructure): End-to-end design, engineering consultancy, and project management for the structured internal network infrastructure serving the tower’s shared ICT and ELV platforms, incorporating deployment of carrier-grade active equipment and high-performance wireless connectivity to ensure scalability, resilience, and operational continuity.

Approach

  1. Define: confirm ICT scope boundaries, priorities, and acceptance criteria
  2. Plan: map milestones and dependencies into an execution roadmap
  3. Coordinate: align stakeholders and vendors through consistent communication
  4. Control: track progress, manage risks/issues, and keep delivery predictable
  5. Handover: support readiness and acceptance steps for a smooth transition

Outcome (High-Level)

Through disciplined governance and clear coordination for the ICT workstream, CITROBC supported a controlled delivery process that improved alignment across teams and helped keep execution consistent with the agreed plan and milestones.

Looking for Project Management for mission-critical ICT infrastructure?

Reach out to CITROBC to discuss how we can support your next infrastructure project with structured planning, coordination, and reliable delivery.

info@citrobc.com +357 22263805 +357 99125356
Office: Chrysanthou Mylona 12, Limassol, Cyprus